Planning channel and bridges Muehle river Nueziders

Underground- and hydraulic structures

Building category

Solid construction

Construction method

Detail planning, Planning of structural framework

Performed services

Inland

Region

August 2023

Processing time from

November 2025

Processing time until

DI Georg Wallner

Project manager

DI Marina Gschwendtner

Substitute project manager

Laetitia Elsener, Bojana Panic

Project team member

3.500.000,00 €

Project costs

Wildbach- und Lawinenverbauung Gebietsbauleitung Bludenz

Client

Description of project

Between 2023 and 2025 the Muehle river in Nueziders (A) got a new edging in shape of an open channel as commissioned by the Torrent and Avalanche Protection Office, Bludenz. Another part of this project was the construction of several bridges and culverts. Thus, the Muehle river reached the required level of flood-protection in the village centre.

Description of tasks

  • structural calculations of channel, bridges and culverts
  • constructional optimisation of constructions
  • design of site plans, structural plans and formwork plans
  • design of reinforcement plans and in-situ inspection of armouring