New building of bridges across Zürsbach, Zürs

Bridges, Infrastructure

Building category

Solid construction

Construction method

Detail planning, Planning of structural framework

Performed services

Inland

Region

May 2011

Processing time from

June 2011

Processing time until

DI Sascha Grujic

Project manager

Wildbach- und Lawinenverbauung Gebietsbauleitung Bludenz

Client

Integral bridges

Type of bridge

1

Number of fields

6,60 m

Maximum span

6,80 m

Length of bride

35,00 m²

Expanse of bridge

Description of project

In behalf of the torrents and avalanche control, section Bludenz, we worked out the detailed planning and supporting structure planning for two bridges across the Zürs-river.

  • 2 integral bridges: length = 6.80 m, span length = 6.40 m, area = 35 m2

Description of tasks

  • Site inspection and in-situ survey
  • Structure planning and static calculations
  • Detailed plans

You would like to know more about our projects or you have detailed questions? Don’t hesitate and get in touch with us here.