Building of new bridge Schoeffaubach, Bad Ischl

Bridges, Infrastructure

Building category

Solid construction

Construction method

Planning of structural framework

Performed services

Inland

Region

November 2016

Processing time from

May 2017

Processing time until

DI Georg Wallner

Project manager

DI Sascha Grujic

Substitute project manager

Brandl Bau GmbH

Client

Integral bridges

Type of bridge

1

Number of fields

6,00 m

Maximum span

6,00 m

Length of bride

43,00 m²

Expanse of bridge

5,00 m

Width of road

100,00 m

Length of road

Description of project

Our task was to adapt the submitted bridge planning to the requirements and conditions according to the permission of the Water Act.

new construction of a half-frame-bridge (integral bridge) across the Schoeffau-river between Salzburg and Bad Ischl (A)

  • Clear span: 6.16 m, clear height under bridge: approx. 3.00 m
  • All-over width of bridge: 6.00 m with expansion to 7.45 m for a more suitable connection of the road to the river bank on the right hand side
  • Width of edge beams: each 50 cm
  • In the area of the channel: facing shell made of natural stones

Description of tasks

  • Adaption of bridge geometry according to the permission/creation of project plan
  • Structural analysis of bridge
  • Creation of reinforcement and formwork plans

You would like to know more about our projects or you have detailed questions? Don’t hesitate and get in touch with us here.