Bridges, Infrastructure
Building category
Solid construction
Construction method
Detail planning, Planning of structural framework
Performed services
Inland
Region
October 2016
Processing time from
November 2016
Processing time until
DI Walter Reisenauer
Project manager
DI Sascha Grujic
Substitute project manager
DI Georg Wallner
Project team member
Wildbach- und Lawinenverbauung Gebietsbauleitung Bludenz
Client
Integral bridges
Type of bridge
1
Number of fields
3,60 m
Maximum span
3,60 m
Length of bride
18,10 m²
Expanse of bridge
Description of project
We planned the supporting structure of the new built, loosely reinforced bridge Rofelbach in Nenzing for the torrents and avalanche control, section Bludenz.
Description of tasks
- site inspection and in-situ survey
- structure planning and static calculations
- detailed plans