New construction of bridge across Mustergielbach, Vandans

Bridges, Infrastructure

Building category

Solid construction

Construction method

Detail planning, Planning of structural framework

Performed services

Inland

Region

January 2015

Processing time from

September 2016

Processing time until

DI Sascha Grujic

Project manager

Wildbach- und Lawinenverbauung Gebietsbauleitung Bludenz

Client

Integral bridges

Type of bridge

1

Number of fields

6,60 m

Maximum span

7,20 m

Length of bride

39,60 m²

Expanse of bridge

Description of project

We were commissioned by the torrents and avalanche protection office, section Bludenz, with the structural analysis for the bridge across the Mustergiel-river, Vandans.

Description of tasks

  • Site inspection and in-situ survey
  • Structure planning and static calculations
  • Elaboration of detailed plans

You would like to know more about our projects or you have detailed questions? Don’t hesitate and get in touch with us here.