Tunnel
Building category
Solid construction
Construction method
Building inspection , Detail planning, Tender offer
Performed services
Inland
Region
September 2022
Processing time from
April 2025
Processing time until
DI Georg Wallner
Project manager
DI Stefan Gschwendtner
Substitute project manager
Bojana Panic
Project team member
Amt der Vorarlberger Landesregierung
Client
22,00 m
Length of tunnel
State road
Road networks
Description of project
The Spar-vault was built in 1935 as part of the Flexen-gallery on the L198 between Kloesterle and Lech am Arlberg. The County Government of Vorarlberg started refurbishment on the age-related damages at the vault/culvert in 2022.
The works included the restauration of the concrete damages, concrete spalling, reinforcement corrosion of the bridge vault, damages on the stone facing and on the front surface of the Spar-vault as well as rock extractions beneath the vault’s abutment. Furthermore, the culvert was stabilized.
Our office was commissioned with the project engineering of all building works.
Description of tasks
- In-situ inspection and examination of structures
- Elaboration of inspection report and tender documents
- Elaboration of action plans and refurbishment plans
- Drafting of location plan and traffic routing plan
- Supervision during execution period regarding structural details