Industrial- and commercial buildings
Building category
Timber construction, Solid construction, Steel construction
Construction method
Detail planning, Planning for submission, Building supervision, Planning of structural framework
Performed services
Inland
Region
July 2021
Processing time from
March 2023
Processing time until
DI Sascha Grujic
Project manager
DI Walter Reisenauer
Substitute project manager
DI Alexander Sparr, DI Laetitia Elsener
Project team member
Adolf ERHART GmbH
Client
3.630,00 m³
Building volume
432,00 m²
Gross floor area
Description of project
Erhart Ltd. in Sonntag (A) runs a sawmill with cutting machinery, log sawing facilities, wood plane equipment, wood drying chamber etc. From July 2021 until March 2023 a new e-filter-tower and the roofing of the southern handling area were built on the premises. The foundation was realized as a ferroconcrete construction, the pillars and purlin supports were built as steel structures and the walls of the e-filter-tower as well as the roof system were put up as timber constructions.
The e-filter-tower has a size of 5.50 m x 9.50 m and is approximately 8.50 m high. The top edge of the finished floor is situated at + 6.75 m, the top edge of the parapet on + 15.25m. The roofing of the handling area has a roofage of 432 m2. A 40 m long roof light was installed on the south side of this pent roof with a height of 1.80 m.
Description of tasks
- Structural calculations and application planning for the ferroconcrete-, steel- and timber building works according to current laws and regulations
- Execution planning and reinforcement plans
- Construction supervision during project execution
You would like to know more about our projects or you have detailed questions? Don’t hesitate and get in touch with us here.