Industrial- and commercial buildings
Building category
Timber construction, Solid construction, Steel construction
Construction method
Planning for submission, Building supervision, Planning of structural framework
Performed services
Inland
Region
January 2022
Processing time from
March 2023
Processing time until
DI Alexander Sparr
Project manager
DI Sascha Grujic
Substitute project manager
DI Marina Häusle, DI Walter Reisenauer
Project team member
Adolf ERHART GmbH
Client
2.332,10 m³
Building volume
269,00 m²
Gross floor area
Description of project
An extension of the north-side storage depot of about 16 m was built on the premises of the Erhart Ltd, Sonntag (A). The storehouse is 15.80 m x 17.10 m large. The effective area sums up to approx. 250 m2, the average clear height inside is approx. 8.50 m. The floor slab and the walls were built in ferroconcrete, the purlin supports in steel and the roof construction is a timber design. Our office was commissioned with the structural analysis as well as the in-situ construction supervision from January 2022 until March 2023.
Description of tasks
- Structural calculations for the ferroconcrete-, steel- and timber building works according to current laws and regulations
- Application planning
- Creation of reinforcement plans
- Construction supervision during project execution
You would like to know more about our projects or you have detailed questions? Don’t hesitate and get in touch with us here.