Erhart Ltd Timber Production, extension storage depot north

Industrial- and commercial buildings

Building category

Timber construction, Solid construction, Steel construction

Construction method

Planning for submission, Building supervision, Planning of structural framework

Performed services

Inland

Region

January 2022

Processing time from

March 2023

Processing time until

DI Alexander Sparr

Project manager

DI Sascha Grujic

Substitute project manager

DI Marina Häusle, DI Walter Reisenauer

Project team member

Adolf ERHART GmbH

Client

2.332,10 m³

Building volume

269,00 m²

Gross floor area

Description of project

An extension of the north-side storage depot of about 16 m was built on the premises of the Erhart Ltd, Sonntag (A). The storehouse is 15.80 m x 17.10 m large. The effective area sums up to approx. 250 m2, the average clear height inside is approx. 8.50 m. The floor slab and the walls were built in ferroconcrete, the purlin supports in steel and the roof construction is a timber design. Our office was commissioned with the structural analysis as well as the in-situ construction supervision from January 2022 until March 2023.

Description of tasks

  • Structural calculations for the ferroconcrete-, steel- and timber building works according to current laws and regulations
  • Application planning
  • Creation of reinforcement plans
  • Construction supervision during project execution