Industrial- and commercial buildings
Building category
Timber construction, Solid construction, Steel construction, Composite construction
Construction method
Planning for submission, Building supervision, Planning of structural framework, Energy performance certificate
Performed services
Inland
Region
November 2015
Processing time from
June 2021
Processing time until
Alexander Sparr
Project manager
DI Sascha Grujic
Substitute project manager
DI Georg Wallner, Alexander Grujic
Project team member
Adolf ERHART GmbH
Client
5.470,00 m³
Building volume
860,50 m²
Gross floor area
Description of project
From 2015 until 2021 the Erhard Ltd Timber Production has built a sharpening room on the first floor which is used for wood processing. The effective surface for the new area on the upper floor is approximately 750 m2. The top edge of this floor is situated + 8.80 m above ground level and the level below is used as a roofed handling area. The building was constructed in a composite design: foundations and walls on the ground floor with timber; framework on the upper floor with steel; ground/walls on the upper storey and gable roof construction as timber works. Our office was commissioned with the planning, the structural dimensioning as well as the construction supervision.
Description of tasks
- Structural calculations and application planning for the ferroconcrete-, steel- and timber building works according to current laws and regulations
- Creation of reinforcement plans
- Drafting of energy performance certificate
- Construction supervision during project execution
You would like to know more about our projects or you have detailed questions? Don’t hesitate and get in touch with us here.