Bridge inspections state roads VLBG 2012

Bridges, Infrastructure

Building category

Solid construction, Steel construction

Construction method

Building inspection

Performed services

Inland

Region

January 2012

Processing time from

December 2012

Processing time until

DI Georg Wallner

Project manager

DI Sascha Grujic

Substitute project manager

Amt der Vorarlberger Landesregierung

Client

Arched bridge, Culverts, T-beam bridges, Slab bridges

Type of bridge

1

Number of fields

17,00 m

Maximum span

18,60 m

Length of bride

643,00 m²

Expanse of bridge

Private road

Type of road

1.111,00 m

Width of road

1.111,00 m

Length of road

Description of project

In 2013 we were commissioned by the state government of Vorarlberg, department of road constructions, to inspect the following bridges in summary:

15 bridges with a total surface of 1893 m2 and an overall length of 89 m:

  • 2 steel bridges with a surface of 396 m2
  • 1 quarry stone vault with a length of 3.40 m and a surface of 95 m2
  • 12 loosely reinforced concrete girder bridges

Description of tasks

  • Site inspection and survey of the bridges and culverts with photographically documentation
  • Composition of inspection reports with detection of damage classes
  • Elaboration of layout plans and damage plans

You would like to know more about our projects or you have detailed questions? Don’t hesitate and get in touch with us here.