Inspection of bridges and constructions state roads Vorarlberg 2024

Bridges, Supporting structures

Building category

Steel construction

Construction method

Building inspection

Performed services

Inland

Region

January 2024

Processing time from

December 2024

Processing time until

DI Walter Reisenauer

Project manager

DI Marina Gschwendtner

Substitute project manager

DI Stefan Gschwendtner

Project team member

Amt der Vorarlberger Landesregierung

Client

Arched bridge, Integral bridges, Slab bridges, Prestressed concrete bridge, steel composite

Type of bridge

53

Number of fields

44,00 m

Maximum span

1.329,00 m

Length of bride

14.815,00 m²

Expanse of bridge

567,00 m

Description of project

In 2024 our office inspected the following road constructions for the county government of Vorarlberg, department of road construction:

  • Inspection of bridges on the L1 – L205, first survey, part 2, 4, 7 and 8
  • Inspection of retaining walls on the L1 – L205, first survey 2024 part 5 and recurrent survey 2024 part 1
  • Inspection of directional gantries L190 – L197, first survey 2024, part 1
  • Inspection of sag L87, recurrent survey 2024, part 1

26 bridges with an overall surface of 14,815 m2 and a total length of 1,329 m, of which:
- 11 prestressed concrete bridge with a surface of 11,731 m2
- 15 loosely reinforced ferroconcrete bridges with a surface of 3,084 m2

21 retaining walls with an overall length of 567 m and a total surface of 1,340 m2

2 direction signs

1 sag with a total length of 37 m

Description of tasks

  • Site inspection and survey of the bridges and culverts with photographic documentation
  • Elaboration of test reports including damage category
  • Drafting of general plans and damage plans
  • Measuring of bearing and expansion joints displacements