ASFINAG structural verification refurbishment bridges Nenzing

Bridges

Building category

Solid construction, Miscellaneous

Construction method

Examination

Performed services

Inland

Region

August 2021

Processing time from

October 2024

Processing time until

DI Sascha Grujic

Project manager

DI Georg Wallner

Substitute project manager

ASFINAG Bau Management GmbH

Client

Box girder bridges, T-beam bridges, Prestressed concrete bridge

Type of bridge

10

Number of fields

70,00 m

Maximum span

365,00 m

Length of bride

10.000,00 m²

Expanse of bridge

Description of project

The Asfinag refurbished the bridges W16 – W18 and W20 on the motorway A14 between August 2021 and October 2024. Our office was commissioned with the verification of the structural analysis regarding plans and implementation.

Description of tasks

  • structural review of tender and execution plannings for road surface and bridge refurbishments
  • structural review and examination of centring including accompanying inspection of truss construction