Bridges, Underground- and hydraulic structures, Infrastructure
Building category
Earth- and soil engineering
Construction method
Planning for submission
Performed services
Inland
Region
May 2013
Processing time from
December 2015
Processing time until
DI Sascha Grujic
Project manager
25.000.000,00 €
Project costs
ASFINAG - Autobahnen- und Schnellstraßen Finanzierungs AG
Client
Integral bridges, untensioned
Type of bridge
10
Number of fields
19,00 m
Maximum span
183,00 m
Length of bride
Motorway
Type of road
1.100,00 m
Length of road
Description of project
We were assigned by the Asfinag Bau Management GmbH with the permit application planning for the reconstruction of the junction Bludenz/Buers. From May 2013 until December 2015 our office formulated the project regarding the road construction, water law and nature protection law.
Description of tasks
- Depiction of existing construction, design review of basic details
- Draft of installation plan and digital terrain model
- Planning adaptions of connecting roads and conversion of crossroads into roundabout
- Permit application planning for engineering structures (bridges, retaining walls, watercourse protection facilities, relocation of pylon)
- Planning enlargement of breakdown lanes in both driving directions
You would like to know more about our projects or you have detailed questions? Don’t hesitate and get in touch with us here.