Bridges
Building category
Solid construction, Prestressed concrete
Construction method
Examination
Performed services
Inland
Region
May 2024
Processing time from
November 2024
Processing time until
DI Sascha Grujic
Project manager
DI Marina Gschwendtner
Substitute project manager
DI Stefan Gschwendtner
Project team member
ASFINAG Bau Management GmbH
Client
Box girder bridges, T-beam bridges, Prestressed concrete bridge
Type of bridge
25
Number of fields
72,00 m
Maximum span
275,00 m
Length of bride
3.646,00 m²
Expanse of bridge
Description of project
The Asfinag Bau Management GmbH commissioned us with the bridge inspections on the A14 and S16, part 2, in the year 2024.
These inspections comprised 7 bridges on the A14 and 5 bridges on the S16 with an overall surface of 3,646 m2
Types of bridges:
- prestressed concrete bridge: 192 m2 (1 bridge)
- ferroconcrete bridges: 3,454 m2 (11 bridges)
Description of tasks
- Site inspection and survey of bridges with mapped and photographic documentation
- Elaboration of test reports including damage category
- Drafting of general plans and damage plans
- Measuring of bearing displacements and expansion joints displacements
You would like to know more about our projects or you have detailed questions? Don’t hesitate and get in touch with us here.