ASFINAG bridge inspections A14/S16, 2024

Bridges

Building category

Solid construction, Prestressed concrete

Construction method

Examination

Performed services

Inland

Region

May 2024

Processing time from

November 2024

Processing time until

DI Sascha Grujic

Project manager

DI Marina Gschwendtner

Substitute project manager

DI Stefan Gschwendtner

Project team member

ASFINAG Bau Management GmbH

Client

Box girder bridges, T-beam bridges, Prestressed concrete bridge

Type of bridge

25

Number of fields

72,00 m

Maximum span

275,00 m

Length of bride

3.646,00 m²

Expanse of bridge

Description of project

The Asfinag Bau Management GmbH commissioned us with the bridge inspections on the A14 and S16, part 2, in the year 2024.

These inspections comprised 7 bridges on the A14 and 5 bridges on the S16 with an overall surface of 3,646 m2

Types of bridges:
- prestressed concrete bridge: 192 m2 (1 bridge)
- ferroconcrete bridges: 3,454 m2 (11 bridges)

Description of tasks

  • Site inspection and survey of bridges with mapped and photographic documentation
  • Elaboration of test reports including damage category
  • Drafting of general plans and damage plans
  • Measuring of bearing displacements and expansion joints displacements