ASFINAG bridge and constructions inspections A14/S16, 2023

Bridges

Building category

Solid construction, Prestressed concrete

Construction method

Examination

Performed services

Inland

Region

March 2023

Processing time from

December 2023

Processing time until

DI Sascha Grujic

Project manager

DI Marina Gschwendtner

Substitute project manager

DI Stefan Gschwendtner

Project team member

ASFINAG Bau Management GmbH

Client

Culverts, Box girder bridges, T-beam bridges, Prestressed concrete bridge

Type of bridge

48

Number of fields

50,50 m

Maximum span

1.125,00 m

Length of bride

16.575,00 m²

Expanse of bridge

Description of project

We inspected the bridges on the A14 and S16, part 1, for the Asfinag Bau Management GmbH in 2023.

The inspection comprised 13 bridges on the A14 and 10 bridges on the S16 with an overall surface of 16,575.0 m2

Types of bridges:
- prestressed concrete bridges: 732 m2 (2 bridges)
- ferroconcrete bridges: 15,843 m2 (21 bridges)

Description of tasks

  • Site inspection and survey of bridges and culverts with mapped and photographic documentation
  • Elaboration of test reports including damage category
  • Drafting of general plans and damage plans
  • Measuring of bearing displacements and expansion joints displacements

You would like to know more about our projects or you have detailed questions? Don’t hesitate and get in touch with us here.