Bridges, Infrastructure
Building category
Earth- and soil engineering, Solid construction
Construction method
Detail planning, Planning of structural framework
Performed services
Inland
Region
September 2018
Processing time from
December 2023
Processing time until
DI Georg Wallner
Project manager
Mag. DI (FH) Sascha Grujic
Substitute project manager
DI Marina Gschwendtner, Anja Dünser, Laetitia Elsener
Project team member
ASFINAG Bau Management GmbH
Client
Integral bridges, untensioned
Type of bridge
1
Number of fields
8,00 m
Maximum span
16,00 m
Length of bride
192,00 m²
Expanse of bridge
Description of project
During the new building of the (restricted) junction Auhof on the A7 the Kogler Way had to be relocated and enlarged. Therefore, the building of a new bridge over the Katzbach was necessary. The bridge was built as a frame. The frame is covered with the road embankment, which is why the support structure was realised as a trought.
Description of tasks
- Structural calculations of the integral bridge
- Elaboration of detailed solutions in support of the planning engineer considering current standards and regulations
- Design of formwork plans for the execution project
- Design of reinforcement plans
You would like to know more about our projects or you have detailed questions? Don’t hesitate and get in touch with us here.