ASFINAG, A10, condition examination bridges and noise protection walls

Bridges, Infrastructure

Building category

Solid construction

Construction method

Building inspection

Performed services

Inland

Region

May 2024

Processing time from

December 2024

Processing time until

DI Walter Reisenauer

Project manager

DI Rudolf Pernkopf

Substitute project manager

ASFINAG - Autobahnen- und Schnellstraßen Finanzierungs-AG

Client

Prestressed concrete bridge, Steel girder with timber planking, steel composite

Type of bridge

8

Number of fields

27,50 m

Maximum span

210,00 m

Length of bride

2.876,00 m²

Expanse of bridge

Motorway

Type of road

Description of project

In 2024 we inspected several bridges and noise protection walls on the A10, Tauern motorway, as commissioned by the ASFINAG. Additionally we were requested to elaborate a structural proposal for the renovation of the ventilating ceiling in the Tauern tunnel.

The inspected noise protection walls are 2,705 m long and have an overall surface of 12,288 m2.

Description of tasks

  • in-situ building inspections
  • draft of examination report
  • draft of layout plans and damage plans
  • additional order due to results of in-situ examination:
    - recalculation of adjoining bridge
    - memorandum about cracks in the “Zederhaus” housing
  • additional order:
    - draft of renovations proposal and memorandum about ventilation ceiling of Tauern tunnel

You would like to know more about our projects or you have detailed questions? Don’t hesitate and get in touch with us here.