Tunnel Duernstein

Infrastructure, Tunnel

Building category

Solid construction, Miscellaneous

Construction method

Detail planning, Planning of structural framework

Performed services

Inland

Region

June 2018

Processing time from

December 2018

Processing time until

DI Urs H. Grunicke, UHG Consult ZT

Project manager

DI Rudolf Pernkopf

Substitute project manager

DI Sascha Grujic, Alexander Grujic

Project team member

UHG Consult Ziviltechniker

Client

Federal road

Type of road

7,50 m

Width of road

472,30 m

Length of road

472,30 m

Length of tunnel

Federal road

Road networks

Description of project

The tunnel Duernstein is situated on the B3, Donau Street in the Wachau (A). It is a two-lane road tunnel with an overall length of 472.3 m, built in mining method (“Belgium tunnel construction method”) including portal buildings. The tunnel was opened in 1959.

During general restoration works in 2018 the interior construction was renewed by removal of the existing inner shell, the new building of the seal and sprayed concrete inner lining.

The office UHG Consult ZT – DI Urs H. Grunicke was commissioned with planning an alternative concept for the building contractor. We supported them as representative project manager and with the planning.

Description of tasks

  • Detailed design of structural engineering of reinforced inner shell: two-ply reinforced, in the side wall with smoothed white cement
  • Structural planning resp. statical-construction planning of reinforced inner shell including auxiliary and mounting construction
  • Creation of plans