Bridges, Infrastructure
Building category
Solid construction
Construction method
Detail planning, Planning of structural framework
Performed services
Inland
Region
September 2013
Processing time from
September 2014
Processing time until
DI Sascha Grujic
Project manager
DI Georg Wallner
Substitute project manager
ASFINAG - Autobahnen- und Schnellstraßen Finanzierungs-AG
Client
Box girder bridges
Type of bridge
8
Number of fields
39,70 m
Maximum span
205,00 m
Length of bride
8.026,00 m²
Expanse of bridge
Bridge V32L direction Bregenz
Technical details: 8 fields, range 39.86 m to 14.04 m, total length 202.86 m, width 17.70 m, area 3503.90 m²
The bridge consists of single span girders, which are connected with spring plates respectively expansion joints. The support structure was built as loosely reinforced T-beams and at the largest field as a hollow box with several cells made of prestressed concrete.
Bridge V32R direction Bludenz
Technical details: 8 fields, range 39.86 m to 14.04 m, total length 202.86 m, width 17.70 m, area 3503.90 m²
This bridge consists of single span girders, which are connected with spring plates respectively expansion joints. The support structure was built as loosely reinforced T-beams and at the largest field as a hollow box with several cells made of prestressed concrete.
Bridge V33, both directions
Technical details: 3 fields, range 8.25 m resp. 18.50 m, total length 36.00 m, width of both directions 340.73 m, area 1250.00 m²
Here the single span girder was connected with spring plates and the T-beam cross-section was loosely reinforced.
Reconstruction measures
- Complete restructuring including new seal and drainage, new expansion joints and partially replacement of bearing as well as concrete repair at V32 and V33
- Upgrade to retaining stage H4b on the central reservation and edge strips including strengthening of the cantilevers at V32
- Upgrade to retaining stage H4b on the central reservation and edge strips including strengthening of the cantilevers and H2 on the bridge edges at V33
- Renewal of gravel wall and approach slabs at V33
Description of tasks
- Tender planning including statically constructive development/li>
- Collaboration at draft of specifications and complete quantity survey
- Execution planning including statically constructive development
- Creation of all necessary plans
- Coordination of protective scaffolding for the area of federal rail tracks
- Traffic management concept and traffic management plans (traffic routing 4+0 and 3+1, according to construction phase)