Protective structures, Underground- and hydraulic structures
Building category
Solid construction
Construction method
Detail planning, Planning of structural framework
Performed services
Inland
Region
October 2011
Processing time from
November 2010
Processing time until
DI Sascha Grujic
Project manager
Wildbach- und Lawinenverbauung Gebietsbauleitung Bludenz
Client
48,00 m
Length of crown dam
17,00 m
Height
Description of project
As commissioned by the torrents and avalanche protection office, section Bludenz, we prepared the detailed planning and the structure planning for the barrier in the Balbier river in St. Gallenkirch (total area 620 m2).
Description of tasks
- site inspection and in-situ survey
- structure planning and static calculations
- elaboration of detailed plans