Public buildings
Building category
Solid construction, System building construction
Construction method
Planning of structural framework
Performed services
Inland
Region
September 2015
Processing time from
January 2017
Processing time until
DI Georg Wallner
Project manager
DI Sascha Grujic
Substitute project manager
Anja Dünser
Project team member
2.375.000,00 €
Project costs
Gemeinde Bad Goisern
Client
Description of project
The building consists of a one-storey vehicle hall for the fire brigade (l/w/h = aprrox. 31m/20m/5.50m - 6.80m), a hose tower (h = approx. 12m) and a two-storey area (head-end structure) with garages for the water- and mountain rescue and other rooms (in total l/w/h = approx. 27m/14.50m/6m - 7.20m). The difference in width between the two buildings is connected by a 4.50 m projecting canopy.
The building was mainly erected as reinforced concrete structure with semi-finished parts. The large span lengths of the vehicle hall were traversed by hollow core slabs.
A difficult task was the big size of the projecting canopy, in which the reinforced concrete ceiling and the hollow core slabs converge. Owing to the chosen solution a harmonic deformation pattern could be found.
Description of tasks
- Planning and calculation of the solid construction with single steel girders
- Elaboration of a solution for the projecting canopy with steel girders, which serve as a support for the hollow core slab and to which the reinforced concrete ceiling (element slab) connects