New building of Rofelbach bridge, Nenzing (A)

Bridges, Infrastructure

Building category

Solid construction

Construction method

Detail planning, Planning of structural framework

Performed services

Inland

Region

October 2016

Processing time from

November 2016

Processing time until

DI Walter Reisenauer

Project manager

DI Sascha Grujic

Substitute project manager

DI Georg Wallner

Project team member

Wildbach- und Lawinenverbauung Gebietsbauleitung Bludenz

Client

Integral bridges

Type of bridge

1

Number of fields

3,60 m

Maximum span

3,60 m

Length of bride

18,10 m²

Expanse of bridge

Description of project

We planned the supporting structure of the new built, loosely reinforced bridge Rofelbach in Nenzing for the torrents and avalanche control, section Bludenz.

Description of tasks

  • site inspection and in-situ survey
  • structure planning and static calculations
  • detailed plans

You would like to know more about our projects or you have detailed questions? Don’t hesitate and get in touch with us here.