Industrial- and commercial buildings
Building category
Timber construction, Solid construction, Steel construction
Construction method
Detail planning
Performed services
Inland
Region
February 2017
Processing time from
May 2017
Processing time until
Alexander Sparr
Project manager
DI Sascha Grujic
Substitute project manager
Fetzel GmbH
Client
9.550,00 m³
Building volume
1.668,00 m²
Gross floor area
Description of project
The Fetzel Kanaltechnik GmbH has built a new commercial building in Schlins. A new two-storey office building, a large garage, a roofed company filling station, a washing area and an interim storage with drainage system and takeover plant were built at this location.
Description of tasks
-
Elaboration of pre-construction drawings and project planning for the complete building project
You would like to know more about our projects or you have detailed questions? Don’t hesitate and get in touch with us here.