Bridges
Building category
Timber construction, Steel construction
Construction method
Detail planning, Planning of structural framework
Performed services
Inland
Region
April 2014
Processing time from
July 2014
Processing time until
DI Sascha Grujic
Project manager
DI Georg Wallner
Substitute project manager
Gemeinde Sonntag
Client
Frame bridges
Type of bridge
1
Number of fields
24,00 m
Maximum span
27,60 m
Length of bride
36,43 m²
Expanse of bridge
Description of project
The old Reutele-Bridge was destroyed at the flood in August 2005. Therefore the erection of a new bridge in consideration of the updated flood flows was necessary. The characteristic of the hiking bridge across the Lutz in the municipality of Sonntag is that it is made of three crane girder parts of a tower crane, which are joined with plug connections common in crane construction. Through additional diagonals at the girder joints and strengthening at the bridge supports it was possible to adapt the framework of the crane girders in a way to create a fully adequate pedestrian bridge.
Bridge details:
- Footbridge range 24.00 m
- Overall length 27.60 m
- Width 1.20 m
- Area 33.12 m²
Description of tasks
- Calculation and dimensioning of the support structure
- Detailed planning of the bridge including reinforcement measures and adaption for installation of railings and surface
- Detailed planning of the required adaption of the abutment, which was prepared with mortared stone layers in the course of the bank protection works