Consolidation check dam Auenlatschbach

Protective structures, Underground- and hydraulic structures

Building category

Solid construction

Construction method

Detail planning, Planning of structural framework

Performed services

Inland

Region

August 2018

Processing time from

October 2018

Processing time until

DI Georg Wallner

Project manager

DI Sascha Grujic

Substitute project manager

Wildbach- und Lawinenverbauung Gebietsbauleitung Bludenz

Client

27,20 m

Length of crown dam

12,00 m

Height

Description of project

The drop structure consists of a main and a subsidiary barrier, which form a stilling basin. The main dam with wing walls is connected to the subsidiary dam with cheek ramps and thus works as dissolved framework – like a cantilever retaining wall.

Description of tasks

  • Static dimensioning of the dam
  • Detailed planning of the dam
  • Formwork and reinforcement plans