Protective structures, Underground- and hydraulic structures
Building category
Solid construction
Construction method
Detail planning, Planning of structural framework
Performed services
Inland
Region
August 2018
Processing time from
October 2018
Processing time until
DI Georg Wallner
Project manager
DI Sascha Grujic
Substitute project manager
Wildbach- und Lawinenverbauung Gebietsbauleitung Bludenz
Client
27,20 m
Length of crown dam
12,00 m
Height
Description of project
The drop structure consists of a main and a subsidiary barrier, which form a stilling basin. The main dam with wing walls is connected to the subsidiary dam with cheek ramps and thus works as dissolved framework – like a cantilever retaining wall.
Description of tasks
- Static dimensioning of the dam
- Detailed planning of the dam
- Formwork and reinforcement plans