Bridges, Supporting structures
Building category
Solid construction
Construction method
Building inspection
Performed services
Inland
Region
January 2020
Processing time from
December 2021
Processing time until
DI Walter Reisenauer
Project manager
DI Sascha Grujic
Substitute project manager
DI Marina Häusle, DI Stefan Gschwendtner
Project team member
Amt der Vorarlberger Landesregierung
Client
Prestressed concrete bridge, untensioned
Type of bridge
2.217,00 m
Length of bride
23.013,00 m²
Expanse of bridge
6.690,00 m
Description of project
In the years 2020 and 2021 our office was commissioned by the county government of Vorarlberg, department of road construction, to inspect the following bridges, trough constructions and road structures.
31 bridges with an overall surface of 23,013.43 m2 and a total length of 2,217.02 m, of which:
- 7 prestressed concrete bridges with a surface of 3,890.92 m2
- 4 loosely reinforced ferroconcrete bridges with a surface of 19,122.50 m2
133 retaining walls with an overall surface of 17,605.23 m2 and a total length of 6,690.61 m, of which:
- 35 supporting structures with a surface of 6,078.11 m2
- 2 trough constructions with an overall area of 2,064.05 m2 and a total length of 172.04 m
Specific features
Both border bridges “Brücke Alter Rhein“ and „Rheinbrücke“ had to be inspected at night, as it was not possible to shut one lane during daytime hours due to the high levels of traffic.
Description of tasks
- Site inspection and survey of the bridges and culverts with photographic documentation
- Elaboration of test reports including damage category
- Drafting of general plans and damage plans
- Measuring and calculation of bearing displacements