Bridges, Infrastructure
Building category
Solid construction
Construction method
Building inspection
Performed services
Inland
Region
January 2014
Processing time from
December 2019
Processing time until
DI Georg Wallner
Project manager
Amt der Vorarlberger Landesregierung
Client
Arched bridge
Type of bridge
1
Number of fields
20,40 m
Maximum span
9,10 m
Length of bride
184,10 m²
Expanse of bridge
Description of project
On behalf of the county government of Vorarlberg, section road constructions, we inspected the Tiefenbach-bridge in Laterns from 2014 to 2019 annually. Large scale landslides, which made one counter bearing move, caused noticeable deformations on the downstream reinforced concrete arch and made continuous inspections necessary. The bridge has a span of 20.40 m and an overall length of 9.05 m.
Description of tasks
- site inspection and expertise of the bridge with photographic documentation
- annual inspection report with determination of damage classes
- elaboration of general plan and damage plans
You would like to know more about our projects or you have detailed questions? Don’t hesitate and get in touch with us here.