Inspection of Tiefenbach bridge, county government of Vorarlberg

Bridges, Infrastructure

Building category

Solid construction

Construction method

Building inspection

Performed services

Inland

Region

January 2014

Processing time from

December 2019

Processing time until

DI Georg Wallner

Project manager

Amt der Vorarlberger Landesregierung

Client

Arched bridge

Type of bridge

1

Number of fields

20,40 m

Maximum span

9,10 m

Length of bride

184,10 m²

Expanse of bridge

Description of project

On behalf of the county government of Vorarlberg, section road constructions, we inspected the Tiefenbach-bridge in Laterns from 2014 to 2019 annually. Large scale landslides, which made one counter bearing move, caused noticeable deformations on the downstream reinforced concrete arch and made continuous inspections necessary. The bridge has a span of 20.40 m and an overall length of 9.05 m.

Description of tasks

  • site inspection and expertise of the bridge with photographic documentation
  • annual inspection report with determination of damage classes
  • elaboration of general plan and damage plans

You would like to know more about our projects or you have detailed questions? Don’t hesitate and get in touch with us here.