Erhart Ltd Timber, new sharpening room - electronics/compressor room incl. lift

Industrial- and commercial buildings

Building category

Timber construction, Solid construction, Steel construction, Composite construction

Construction method

Planning for submission, Building supervision, Planning of structural framework, Energy performance certificate

Performed services

Inland

Region

November 2015

Processing time from

June 2021

Processing time until

Alexander Sparr

Project manager

DI Sascha Grujic

Substitute project manager

DI Georg Wallner, Alexander Grujic

Project team member

Adolf ERHART GmbH

Client

5.470,00 m³

Building volume

860,50 m²

Gross floor area

Description of project

From 2015 until 2021 the Erhard Ltd Timber Production has built a sharpening room on the first floor which is used for wood processing. The effective surface for the new area on the upper floor is approximately 750 m2. The top edge of this floor is situated + 8.80 m above ground level and the level below is used as a roofed handling area. The building was constructed in a composite design: foundations and walls on the ground floor with timber; framework on the upper floor with steel; ground/walls on the upper storey and gable roof construction as timber works. Our office was commissioned with the planning, the structural dimensioning as well as the construction supervision.

Description of tasks

  • Structural calculations and application planning for the ferroconcrete-, steel- and timber building works according to current laws and regulations
  • Creation of reinforcement plans
  • Drafting of energy performance certificate
  • Construction supervision during project execution