Industrial- and commercial buildings
Building category
Timber construction, Solid construction, Steel construction, Composite construction
Construction method
Planning for submission, Building supervision, Planning of structural framework
Performed services
Inland
Region
November 2015
Processing time from
June 2021
Processing time until
Alexander Sparr
Project manager
DI Sascha Grujic
Substitute project manager
DI Georg Wallner, Alexander Grujic
Project team member
Adolf ERHART GmbH
Client
5.470,00 m³
Building volume
860,50 m²
Gross floor area
Description of project
From 2015 until 2021 Erhard Ltd Timber Production extended the existing timber storage depot north for about 44 m. Additionally a pump room including a water tank was installed in the basement for the new “enlarged automatic extinguishing system”. Our office was commissioned with the planning tasks, the structural analysis and the construction supervision.
Description of tasks
- Structural calculations and application planning for the ferroconcrete-, steel- and timber building works according to current laws and regulations
- Creation of reinforcement plans
- Construction supervision during project execution
You would like to know more about our projects or you have detailed questions? Don’t hesitate and get in touch with us here.