Business- and office buildings
Building category
Solid construction
Construction method
Planning for submission
Performed services
Inland
Region
December 2015
Processing time from
August 2017
Processing time until
DI Georg Wallner
Project manager
DI Walter Reisenauer
Substitute project manager
BI-WAT GmbH - Bad Ischler Wassertechnik
Client
16.303,00 m³
Building volume
3.428,00 m²
Gross floor area
Description of project
We have been assigned with planning an annex on the premises of the Bad Ischler Wassertechnik und Edelstahldesign GmbH (BI-WAT). It was the aim of the project to roof a storage yard with a parking deck (point supported reinforced concrete slab) including a motorcycle garage and a show room.
Special challenge
The parking deck had to be integrated to the public road system by building a ramp according to all requirements of the Road Construction Office and the trade authorities. An additional challenge proofed to be the alteration of the public road use during the filing-phase = one way road at junction.
Description of task
- Drafting of permit application
You would like to know more about our projects or you have detailed questions? Don’t hesitate and get in touch with us here.