Bridges, Infrastructure
Building category
Solid construction, Composite construction
Construction method
Building inspection , Examination
Performed services
Inland
Region
April 2019
Processing time from
December 2019
Processing time until
DI Georg Wallner
Project manager
DI Rudi Pernkopf
Substitute project manager
ASFINAG Service GmbH
Client
Box girder bridges, T-beam bridges, Slab bridges
Type of bridge
105
Number of fields
60,50 m
Maximum span
3.337,00 m
Length of bride
50.580,00 m²
Expanse of bridge
Motorway
Type of road
Description of project
In 2019 we inspected 20 bridges for the ASFINAG on the A2 (near Pack) in the course of inspection lot 3 - Graz (total area: 50580 m2 and total length 3337 m). Hereof:
- 11 prestressed concrete bridges with an area of 32038 m2
- 3 composite bridges with an area of 8207 m2
- 1 arched bridge with an area of 6371 m2
105 fields with a range of up to 60.50 m had to be checked on these 20 bridges. The largest bridge has an area of 6469 m2 and a length of 462 m.
Description of tasks
- On-side inspection and evaluation of the bridges and passages with photo record
- Inspection reports and determination of damage classification
- Creation of general plans and damage plans
You would like to know more about our projects or you have detailed questions? Don’t hesitate and get in touch with us here.