Bridges, Infrastructure
Building category
Solid construction
Construction method
Examination
Performed services
Inland
Region
January 2017
Processing time from
December 2017
Processing time until
DI Georg Wallner, DI Walter Reisenauer
Project manager
DI Sascha Grujic
Substitute project manager
ASFINAG Alpenstraßen GmbH
Client
Box girder bridges, T-beam bridges, Slab bridges
Type of bridge
3
Number of fields
52,90 m
Maximum span
68,00 m
Length of bride
960,00 m²
Expanse of bridge
Description of project
In 2017 we were commissioned to inspect the following bridges for the ASFINAG:
22 bridges with a total surface of 9943 m2 and an overall length of 696 m: 2 und einer Gesamtlänge von 696 m:
- 2 reinforced concrete bridges with an expanse of 1920 m2
- 20 loosely reinforced concrete girder bridges
Description of tasks
- Site inspection and survey of the bridges and culverts with photographically documentation
- Composition of inspection reports with detection of damage classes
- Elaboration of layout plans and damage plans
You would like to know more about our projects or you have detailed questions? Don’t hesitate and get in touch with us here.