Bridges, Supporting structures
Building category
Steel construction
Construction method
Building inspection
Performed services
Inland
Region
January 2024
Processing time from
December 2024
Processing time until
DI Walter Reisenauer
Project manager
DI Marina Gschwendtner
Substitute project manager
DI Stefan Gschwendtner
Project team member
Amt der Vorarlberger Landesregierung
Client
Arched bridge, Integral bridges, Slab bridges, Prestressed concrete bridge, steel composite
Type of bridge
53
Number of fields
44,00 m
Maximum span
1.329,00 m
Length of bride
14.815,00 m²
Expanse of bridge
567,00 m
Description of project
In 2024 our office inspected the following road constructions for the county government of Vorarlberg, department of road construction:
- Inspection of bridges on the L1 – L205, first survey, part 2, 4, 7 and 8
- Inspection of retaining walls on the L1 – L205, first survey 2024 part 5 and recurrent survey 2024 part 1
- Inspection of directional gantries L190 – L197, first survey 2024, part 1
- Inspection of sag L87, recurrent survey 2024, part 1
26 bridges with an overall surface of 14,815 m2 and a total length of 1,329 m, of which:
- 11 prestressed concrete bridge with a surface of 11,731 m2
- 15 loosely reinforced ferroconcrete bridges with a surface of 3,084 m2
21 retaining walls with an overall length of 567 m and a total surface of 1,340 m2
2 direction signs
1 sag with a total length of 37 m
Description of tasks
- Site inspection and survey of the bridges and culverts with photographic documentation
- Elaboration of test reports including damage category
- Drafting of general plans and damage plans
- Measuring of bearing and expansion joints displacements
You would like to know more about our projects or you have detailed questions? Don’t hesitate and get in touch with us here.