Bridge inspections state roads VLBG 2018

Bridges, Infrastructure

Building category

Solid construction

Construction method

Building inspection

Performed services

Inland

Region

January 2018

Processing time from

December 2018

Processing time until

DI Georg Wallner, DI Walter Reisenauer

Project manager

DI Sascha Grujic

Substitute project manager

Amt der Vorarlberger Landesregierung

Client

Arched bridge, Box girder bridges, T-beam bridges, Slab bridges

Type of bridge

Description of project

In the year 2018 we were commissioned to inspect the following bridges for the state government of Vorarlberg:

36 bridges with a total surface of 10361,72 m2 and an overall length of 811,25 m:

  • 5 prestressed concrete bridges with an expanse of 2853,89 m2
  • 3 composite bridges with an axpanse of 588,86 m2
  • 28 loosely reinforced ferroconcrete bridges

Description of tasks

  • Site inspection and survey of the bridges and culverts with mapped and photographically documentation
  • Composition of inspection reports with detection of damage classes
  • Elaboration of layout plans and damage plans

You would like to know more about our projects or you have detailed questions? Don’t hesitate and get in touch with us here.