Bridges, Infrastructure
Building category
Solid construction
Construction method
Building inspection
Performed services
Inland
Region
January 2019
Processing time from
February 2019
Processing time until
DI Georg Wallner
Project manager
DI Walter Reisenauer
Substitute project manager
Marktgemeinde Altmünster
Client
T-beam bridges
Type of bridge
1
Number of fields
12,00 m
Maximum span
13,50 m
Length of bride
88,40 m²
Expanse of bridge
Municipal road
Type of road
6,60 m
Width of road
Description of project
Our office was assigned to inspect the bridge over the Dam-river in Reindlmuehl by the market town of Altmuenster and to generate an inspection report. This included the assignment of damage classes as well as the listing of vital preservation measures.
Description of tasks
- In-situ inspection
- Drawing of report including damage classification
- Elaboration of defect plans and general plans
You would like to know more about our projects or you have detailed questions? Don’t hesitate and get in touch with us here.