Bridge inspection Dambach, Reindlmuehl

Bridges, Infrastructure

Building category

Solid construction

Construction method

Building inspection

Performed services

Inland

Region

January 2019

Processing time from

February 2019

Processing time until

DI Georg Wallner

Project manager

DI Walter Reisenauer

Substitute project manager

Marktgemeinde Altmünster

Client

T-beam bridges

Type of bridge

1

Number of fields

12,00 m

Maximum span

13,50 m

Length of bride

88,40 m²

Expanse of bridge

Municipal road

Type of road

6,60 m

Width of road

Description of project

Our office was assigned to inspect the bridge over the Dam-river in Reindlmuehl by the market town of Altmuenster and to generate an inspection report. This included the assignment of damage classes as well as the listing of vital preservation measures.

Description of tasks

  • In-situ inspection
  • Drawing of report including damage classification
  • Elaboration of defect plans and general plans

You would like to know more about our projects or you have detailed questions? Don’t hesitate and get in touch with us here.