Industrial- and commercial buildings, Infrastructure
Building category
Solid construction, Steel construction
Construction method
Examination, Planning of structural framework
Performed services
Inland
Region
November 2020
Processing time from
November 2020
Processing time until
DI Georg Wallner
Project manager
DI Sascha Grujic
Substitute project manager
DI Walter Reisenauer
Project team member
Ing. Berger & Brunner Bauges. m. b. H.
Client
Motorway
Type of road
Description of project
The complete steel structure of the silo platform Nösslach (next to the A13) had to be recalculated. This was necessary as due to general repair works on the silo the original wooden support wreath was replaced by a steel wreath. It was vital to optimize the sheet thickness and the weld seams of the support wreath to reach an economical result.
Description of tasks
- matching the silo’s loads of systemic statics with the local conditions
- detailed dimensioning of the support wreath for the wooden silo
- structural analysis of steel construction for the existing silo platform
You would like to know more about our projects or you have detailed questions? Don’t hesitate and get in touch with us here.