Underground- and hydraulic structures, Infrastructure, Watercourse protection facilities
Building category
Solid construction
Construction method
Expertise, Examination
Performed services
Inland
Region
January 2015
Processing time from
December 2015
Processing time until
DI Walter Reisenauer
Project manager
DI Sascha Grujic
Substitute project manager
ASFINAG Baumanagement GmbH
Client
Motorway
Type of road
311,00 m
Length of road
8.758,00 m²
Base area
Description of project
In 2015 we were commissioned to work out the structural analysis tests for the projects of the ASFINAG Alpenstraßen GmbH as follows:
2 motorway bridges (V50 and V51) with an overall area of 8.758 m2 and a total length of 311 m:
- 2 loosely reinforced concrete bridges
Description of tasks
- stress calculation for official approval of the water retention system Klaus, A14
- stress calculation for official approval of the water retention system Wolfurt, A14
- elaboration of detailed plans