Bridges, Infrastructure
Building category
Solid construction
Construction method
Detail planning, Planning of structural framework
Performed services
Inland
Region
June 2016
Processing time from
July 2019
Processing time until
DI Sascha Grujic
Project manager
DI Walter Reisenauer
Substitute project manager
ASFINAG Alpenstraßen GmbH
Client
T-beam bridges
Type of bridge
20
Number of fields
26,70 m
Maximum span
310,50 m
Length of bride
8.757,50 m²
Expanse of bridge
Motorway
Type of road
Description of project
A14 Rheintal/Walgau motorway -reconditioning of bridges, objects V50 and V51, km 14.600 – 14.900, both carriageways
Our assignment included the preliminary design and the general design, plans for call of proposals as well as execution planning and detailed planning for the following bridges:
- Bridge V50 left + right:
- overall length of bridge 229.14 m
- width 28.60 m
- largest span 27.80 m
- total area: approx. 6,462 m2
- Bridge V51 left + right:
- overall length of bridge 81.41 m
- width 28.60 m
- largest span 27.12 m
- total area approx. 2,296 m2
Description of tasks
The complete refurbishment of the bridges included the following parts:
- Recalculation and structural strengthening of the supporting structure
- Demolition and renewal of:
- road surface,
- bridge sealing,
- expansion joints,
- bearings,
- drainage system,
- edge beam incl. road restraint system and fall protection;
- Concrete repair on substructure and supporting structure
- New building of bridge spans and of a country lane’s underpass
- Planning of traffic routeing during the building works
You would like to know more about our projects or you have detailed questions? Don’t hesitate and get in touch with us here.