Bridges
Building category
Solid construction, Miscellaneous
Construction method
Building inspection
Performed services
Inland
Region
May 2023
Processing time from
December 2023
Processing time until
DI Sascha Grujic
Project manager
DI Walter Reisenauer
Substitute project manager
DI Marina Häusle, DI Stefan Gschwendtner
Project team member
47.500,00 €
Project costs
ASFINAG Bau Management GmbH
Client
Box girder bridges, Prestressed concrete bridge
Type of bridge
4
Number of fields
225,00 m
Maximum span
602,50 m
Length of bride
15.063,00 m²
Expanse of bridge
Description of project
The ASFINAG Bau Management GmbH commissioned us with the bridge and foreland inspections at the viaduct Schottwien on the S06, Semmering dual carriageway, in 2023.
The viaduct Schottwien is a bridge of about 630 m length and 130 m height. The bridge with its foreland securing around the pillars and the abutments were inspected on-site. In this process the anchor beams with anchors were examined and the dynamometers as well as the extensometers were read off. Worth mentioning is the impressive height in which we had to execute the inspections.
As there was a building site on the bridge at the time of the survey, we couldn’t use a bridge inspection devise. Therefore, most of the bridge was examined with the aid of a drone.
Description of tasks
- In-situ inspection of bridge and foreland
- Examination by drone flight
- Inclinometer measurement
- Dynamic follow-up measurement
- Creation of image film
- Drafting of inspection report and plans laws