ASFINAG, A14 - feasibilit study bridge V101

Bridges, Infrastructure

Building category

Solid construction

Construction method

Expertise

Performed services

Inland

Region

August 2020

Processing time from

February 2021

Processing time until

DI Rudolf Pernkopf

Project manager

DI Walter Reisenauer

Substitute project manager

DI Angela Gratzer

Project team member

ASFINAG GmbH

Client

Slab bridges, untensioned

Type of bridge

3

Number of fields

26,50 m

Maximum span

63,00 m

Length of bride

840,00 m²

Expanse of bridge

Description of project

Our office created a feasibility study for the bridge V101, crossover L190 “Straßenhäuser” over the motorway A14 in the space of time from August 2020 to February 2021.

Description of tasks

  • In-situ inspection of the object
  • Preparation of a sampling concept
  • Structural recalculation and creation of a repair work concept with the versions “Mere Reconditioning/Retrofitting Of Bridge/Replacement Building Of Bridge”
  • Résumé of results in a feasibility study including cost estimate

You would like to know more about our projects or you have detailed questions? Don’t hesitate and get in touch with us here.