Bridges, Infrastructure
Building category
Solid construction
Construction method
Expertise
Performed services
Inland
Region
August 2020
Processing time from
February 2021
Processing time until
DI Rudolf Pernkopf
Project manager
DI Walter Reisenauer
Substitute project manager
DI Angela Gratzer
Project team member
ASFINAG GmbH
Client
Slab bridges, untensioned
Type of bridge
3
Number of fields
26,50 m
Maximum span
63,00 m
Length of bride
840,00 m²
Expanse of bridge
Description of project
Our office created a feasibility study for the bridge V101, crossover L190 “Straßenhäuser” over the motorway A14 in the space of time from August 2020 to February 2021.
Description of tasks
- In-situ inspection of the object
- Preparation of a sampling concept
- Structural recalculation and creation of a repair work concept with the versions “Mere Reconditioning/Retrofitting Of Bridge/Replacement Building Of Bridge”
- Résumé of results in a feasibility study including cost estimate
You would like to know more about our projects or you have detailed questions? Don’t hesitate and get in touch with us here.