Infrastructure
Building category
Miscellaneous
Construction method
Planning of structural framework, Tender offer
Performed services
Inland
Region
March 2021
Processing time from
July 2021
Processing time until
DI Rudolf Pernkopf
Project manager
DI Georg Wallner
Substitute project manager
DI Katharina Thomson, DI Angela Gratzer
Project team member
ASFINAG Bau Management GmbH
Client
Motorway
Type of road
Description of project
In 2021 we were assigned by ASFINAG Bau Management GmbH with the elaboration of the tender and the execution planning for the above mentioned project:
West motorway, km 292.35 - km 297.7, lane Walserberg; overhauling/replacement building noise prevention, blacktopping breakdown lane, superstructure refurbishment ramps 2 + 3 Wals, overhauling and reinforcement of bridges’ supporting structures
Description of tasks
- Open land - blacktopping (5 cm), drafting pavement design specification breakdown lane, manoeuvre tracks, ramps, plan for traffic signs; superstructure refurbishment junction Salzburg West, ramps 2 and 3
- Noise prevention walls – in-situ inspection, action planning for reconstruction and coffer change
- Structural calculations, incorporation A01 design concept
- Bridge A001.070+71 - structural calculations, planning reinforcement of supporting structure and new edge beams
- Bridge A001.069 - structural calculations steel structure including foundation for erecting of noise protection walls
- Bridge A001.064-067 – structural calculations re-anchoring of the edge beams from below
You would like to know more about our projects or you have detailed questions? Don’t hesitate and get in touch with us here.